Steel Department of "ArcelorMittal Temirtau" JSC
Project description
Name of work: verification of the report on the inventory of greenhouse gases for the subjects of allocation of quotas for greenhouse gas emissions for 2019.The Steel Department of "ArcelorMittal Temirtau" JSC has a full metallurgical cycle and is located on the same industrial site. The Steel Department includes coke-chemical, sintering, blast-furnace, steelmaking, rolling production, auxiliary shops, and two thermal power plants.
Based on the verification results, the plant operator was issued a conclusion on the report on the inventory of greenhouse gases for submission to the authorized body.
Features
Category: |
Project
|
Share: