Projects

Our goal is to improve the quality of life of people through the implementation of energy-saving technologies.

Green Bridge Company is a local consultant for the implementation of Japanese project "Possibilities of implementing moving electrode electrostatic precipitator (MEEP) in coal fired power plant in Kazakhstan"


Employees of Green Bridge Company were performed work on the collection and processing of information, as well as analysis of data on greenhouse gas emissions from facilities which are included in Kazakhstan GHG emissions trading system commissioned by  USAID  Climate Change Mitigation Program in Kazakhstan (KCCMP).



In 2019, Green Bridge LLP specialists conducted a mandatory environmental audit of Sea Bu Engineering Drilling Company LLP (Aktau).


Employees of Green Bridge LLP developed hazardous waste passports for 9 types of waste.


In the course of the work, an inventory of sources of pollutant emissions, sources of physical impact (noise, vibration and non-ionizing radiation) was carried out, and the size of the SPZ was calculated.


As part of the performance of services, an inventory of pollutant emissions into the atmospheric air was carried out, calculations of pollutant emissions from sources of atmospheric air pollution were carried out, and dispersion was calculated.


In 2018, the specialists of Green Bridge LLP carried out a Mandatory environmental audit of the Serebryanskaya distance of the track of the Branch of the KTZ company - the Semey branch of the backbone network.


In 2019, Green Bridge LLP conducted an audit of the operating ash dump of Troitsk SDPP, a branch of PJSC OGK-2. The audit was carried out on a part of the enterprise, because the power plant is located on the territory of the Russian Federation, and the ash dump is in Kazakhstan.
The basis for the audit was the Conclusion on the mandatory environmental audit issued by the authorized body.
The environmental audit was carried out in accordance with the approved environmental audit plan.


In 2019, Green Bridge LLP conducted a mandatory environmental audit of the Kazakhstanskaya mine of the Coal Department of ArcelorMittal Temirtau JSC. The basis for the audit was the Conclusion on the mandatory environmental audit issued by the authorized body.


In 2019, Green Bridge LLP conducted a mandatory environmental audit for the Lisakovsky Branch of Orken LLP. The main activity of the enterprise is the development of brown iron deposits and the production of concentrate. The enterprise is located in the Kostanay region, Lisakovsk.


The construction site is located on the territory of Arcelor Mittal Temirtau JSC, in the south-eastern part of the CHPP-2 site. Construction is expected to be completed in 21 months.


In 2020, Green Bridge LLP conducted a mandatory environmental audit for Agrointerptitsa LLP. The basis for the audit was the Conclusion on the mandatory environmental audit in relation to the legal entity Agrointerptitsa LLP.


Name of work: adjustment of the draft standards for maximum allowable emissions (MAE) for 2020-2021.
The basis for adjusting the draft MPE is taking into account measures for COVID-19 to ensure civil protection of the population and the safe operation of oil and gas producing enterprises in the region in accordance with the "Action Plan for preparedness in case of deterioration of the situation associated with the spread of coronovirus infection in the Mangistau region".


Job Title: Project of Waste Disposal Standards (PWDP).
Utilization LLP accepts and sends POPs-containing waste (capacitors, transformers) for disposal, generated at various industrial enterprises, which Utilization LLP accepts on a contractual basis.


In 2019, Green Bridge LLP, an accredited greenhouse gas verification body, verified greenhouse gas documents for Angrensor Energo LLP. The plant is included in the National Quota Allocation Plan for 2018-2020, accounting for GHG emissions is based on specific greenhouse gas emission factors.


In 2020, Green Bridge LLP conducted a mandatory environmental audit of Shubarkol Komir JSC at the Central and Western sections. The basis for the audit was the Conclusion on the mandatory environmental audit issued by the authorized body.


The purpose of this work is to determine the amount of harmful substances entering the atmosphere by identifying all sources of air pollution, as well as determining the level of air pollution of the enterprise for 2021 - 2030.


Name of work: verification of the report on the inventory of greenhouse gases for the subjects of allocation of quotas for greenhouse gas emissions for 2019.


The main activity of "Стройконструкция" JSC is the production of ready-mixed concrete and reinforced concrete products. JSC "Стройконструкция" belongs to category I in accordance with Art. 40 of the Environmental Code. As part of the project, an inventory of emissions of pollutants into the atmospheric air was carried out. Calculations of emissions of pollutants from sources of atmospheric air pollution have been carried out and dispersion calculations have been carried out. The project sets standards for maximum permissible emissions (MAE) of pollutants into the atmosphere from the production site. A positive conclusion was received on the developed project.